Temporary Pond Isolation for Outfall Installation

Client

Chasetown Civil Engineering Ltd

Duration

2 Days

Location

Newport Bloors

Share

Chasetown Civil Engineering Ltd required a temporary water control solution at Newport Bloors to facilitate the installation of a new outfall pipe within an existing pond.

The works involved installing the pipe, together with a supporting headwall and debris screen to protect the new outfall and prevent debris entering the pipe. To carry out the installation, a corner section of the pond needed to be isolated and dewatered, creating a suitable working area.