Cofferdam Installation for Weir Investigation, River Darent

Client

CET

Duration

1 Week

Location

Dartford, Kent

Share

CET, on behalf of Dartford Borough Council, commissioned Robert Nicholas to install a temporary cofferdam at Acacia Hall on the River Darent, Dartford.

The works required the river to be isolated to create a dewatered area for concrete core sampling. Before installation, silt and vegetation were cleared from the riverbed to prepare the site. The cofferdam was then installed in a C-shaped arrangement to enclose the required work area and facilitate the investigation.